In June of 2014, the MCEC completed construction of  a Cultural Center in the heart of Pangling, Nepal, on land donated by the community. Inauguration ceremonies were held in August with community leaders, Geshe Sobnam and donors.

The Cultural Center will be a platform to preserve, share and pass on traditional farming methods; to sustain weaving, shoe-making and other art of clothes-making; to continue traditional painting and wood carving practices; to practice indigenous folk medicine; and to learn indigenous music, singing and folk dancing to celebrate local festivals, e.g. harvest and the new year. This Cultural Center would also serve as a local gathering place for contact between younger and older villagers in such a way that a wide range of cultural practices would be sustained and passed on from generation to generation.

 

Estimated cost:  $ 45000 USD

Government of Nepal
Ministry of Local Development
Office of District Development Committee
District Technical Office
Jomsom, Mustang
Abstract of Cost
Project Name:Cultural Hall construction             
Location: Pangling,Kagbeni,Mustang            
S.N Particular of Items Quantities Units Rate Per Amount Remarks
1 Site clearance work  625.00 m2 9.59   5993.75  
2 E/W excavation work 43.88 m3 663.27   29100.97  
3 1:1.5:3 pcc for rcc  7.88 m3 18630.80   146717.55  
4 Reinforcement work  974.53   105.27   102588.90  
5 S/M work in 1:6 c/s mortar  186.45 m3 7825.94   1459134.77  
6 Wood work frame for D/W 0.43 m3 39239.80   16804.44  
7 Wood work for Door shutter  1.17 m2 3834.62   4472.70  
8 Glazed window shutter 9.68 m2 3252.46   31473.40  
9 Wood work for main post 8.91 m3 26732.05   238262.76  
10 300 gaige plastic sheet in roof 368.64 m2 50.00   18432.00  
11 Sakhar mud filling and compaction in roof 49.69 m3 3500.00   173901.00  
12 90mm dia drain pipe 20.00 rm 1100.00   22000.00  
13 20mm plaster in inner side of room over skirting 196.56 m2 314.23   61765.05  
14 Flooring work          0.00  
14.1 Earth filling work and compaction  182.18 m3 102.25   18628.11  
14.2 38mm thick plate floor with (.10*.75) size wooden beam skirting in wall 64.44 m2 1286.84   82923.97  
15 1:3 c/s pointing in outer wall 309.40 m2 187.15   57904.21  
16 Double coat white washing  196.56 m2 104.82   20603.42  
      Sub total cost of project     2490707.02  
17 Electrification work all  complete  as per site incharge   5 % of sub total     124535.35  
18 construction of toilet bathroom and all necessary arrangement of watersupply   8 % of sub total     199256.562  
      Total cost of project      2814498.93  
      VAT  @ 13%      365884.86  
      Contengencies @ 5 %     140724.947  
      Grand total cost of project     3321108.74  
               
               
               
               
In words:- Thirty three  lakhs twenty one thousand one hundred eight ruppes and seventy four  paisa only