The first priority of the MCEC was to stabilize local farming by developing a reliable irrigation system by 2015, so that local farmers of Pangling would enjoy stable irrigation of local crops year after year. The hope was that such an irrigation system would encourage local farmers to work their land to the fullest, increasing the likelihood that they keep and develop their land. This would have a stabilizing effect on the local population and minimize the break-down of local culture. Engineering and geological consultants were brought to the area in 2014 to develop a plan for the most stable irrigation system suitable for the region.

That plan was successfully implemented over the following year and completed in 2015, resulting in stabilization of water resources despite highly variable rain and flows of the Kali Gandaki river that flows through Mustang Valley.

 

Estimated Cost: $ 15500 USD

Government of Nepal  
Ministry of Local Development  
Office of District Development Committee  
District Technical Office  
Jomsom, Mustang  
Abstract of Cost  
Project Name: Illi khet irrigation work             
Location: Pangling,Kagbeni,Mustang            
S.N Particular of Items Quantities Units Rate   Amount  
1 Collection chamber construction 3mx1mx1m size with s/m wall gabion box protection etc all complete 1 nos 250000   250000  
2 Procuring 10 HP  capacity electric morter  1.00 nos 50000   50000  
3 3"dia HDPE 6kgf/cm2 pipe procuring laying joining all complete 110.00 RM 365.00   40150  
4 3" dia HDPE pipe 10kgf/cm2 procuring laying 165.00 RM 496.74   81962.1  
5 10mx5mx2.5m3 capacity pond construction woth s/m wall all complete 1.00 NOS 500000.00   500000  
6 Necessary electrification  1.00 Job 35000.00   35000  
      Total cost of project      957112.1  
      VAT @ 13 %    124424.6  
      Contengencies @ 5 %  47855.61  
      Grand total cost of project  1129392  
               
               
               
               
In words:- Eleven lakhs twenty nine thousand three hundred nienty two ruppes and twenty eight  paisa only