The first priority of the MCEC was to stabilize local farming by developing a reliable irrigation system by 2015, so that local farmers of Pangling would enjoy stable irrigation of local crops year after year. The hope was that such an irrigation system would encourage local farmers to work their land to the fullest, increasing the likelihood that they keep and develop their land. This would have a stabilizing effect on the local population and minimize the break-down of local culture. Engineering and geological consultants were brought to the area in 2014 to develop a plan for the most stable irrigation system suitable for the region.
That plan was successfully implemented over the following year and completed in 2015, resulting in stabilization of water resources despite highly variable rain and flows of the Kali Gandaki river that flows through Mustang Valley.
Estimated Cost: $ 15500 USD
Government of Nepal | |||||||
Ministry of Local Development | |||||||
Office of District Development Committee | |||||||
District Technical Office | |||||||
Jomsom, Mustang | |||||||
Abstract of Cost | |||||||
Project Name: Illi khet irrigation work | |||||||
Location: Pangling,Kagbeni,Mustang | |||||||
S.N | Particular of Items | Quantities | Units | Rate | Amount | ||
1 | Collection chamber construction 3mx1mx1m size with s/m wall gabion box protection etc all complete | 1 | nos | 250000 | 250000 | ||
2 | Procuring 10 HP capacity electric morter | 1.00 | nos | 50000 | 50000 | ||
3 | 3"dia HDPE 6kgf/cm2 pipe procuring laying joining all complete | 110.00 | RM | 365.00 | 40150 | ||
4 | 3" dia HDPE pipe 10kgf/cm2 procuring laying | 165.00 | RM | 496.74 | 81962.1 | ||
5 | 10mx5mx2.5m3 capacity pond construction woth s/m wall all complete | 1.00 | NOS | 500000.00 | 500000 | ||
6 | Necessary electrification | 1.00 | Job | 35000.00 | 35000 | ||
Total cost of project | 957112.1 | ||||||
VAT @ 13 % | 124424.6 | ||||||
Contengencies @ 5 % | 47855.61 | ||||||
Grand total cost of project | 1129392 | ||||||
In words:- Eleven lakhs twenty nine thousand three hundred nienty two ruppes and twenty eight paisa only |
- Mustang Culture and Education Centre
- Successful completion of the Cultural Center in Pangling
- Successful Completion of the Irrigation system to stabilize farming practice
- Successful Completion of the Children's Education System Supportive of Cultural and Spiritual Traditions.
- Mustang Valley Bon Monastery and Spiritual Campus